TRADITIONAL SYSTEM LIFE CYCLE
The goal of the Traditional
System Life Cycle is to keep the project under control and assure that the
information system produced, satisfies the requirements. The traditional system
life cycle divides the project into a series of steps, each of which has
distinct deliverables, such as documents or computer programs. This is known as
the Systems Development Life Cycle (SDLC). The deliverables are related
because each subsequent step builds on the conclusions of previous steps. Some
deliverables are oriented toward the technical staff, whereas others are
directed toward or produced by users and mangers. The latter ensure that users
and their management are included in the system development process.
Although there is general
agreement about what needs to be done in the traditional system life cycle,
different authors name individual steps and deliverables differently. Many
versions of the traditional system life cycle emphasize the building or
software and de-emphasize what happens in the organization before and after
software development. Because this article is directed at business
professionals, its version of the traditional system life cycle emphasizes
implementation and operation in the organization in addition to software development.
The Four Phases of
Traditional System Life Cycle are (Visit Table-I ):
1.
Initiation
2.
Development
3.
Implementation
4.
Operation and Maintenance
Table-I : Phases and Steps of Traditional System Life Cycle
how we can see that Nova BBom comes back to work
1. Initiation
The initiation phase may
begin in many different ways. A user may work with the IS staff to produce a
written request to study a particular business problem. The IS staff may
discover an opportunity to use information systems beneficially and then try to
interest users. A top manager may notice a business problem and ask the head of
IS to look into it. A computer crash or other operational problem may reveal a
major problem that can be patched temporarily but requires a larger project to
fix it completely. Regardless of how this phase begins, its goal is to analyze
the scope and feasibility of a proposed system and to develop a project plan.
This involves two steps, the feasibility study and project planning,
which produce the functional specification and a project plan. The feasibility
study is a user-oriented overview of the proposed information system’s purpose
and feasibility. A system’s feasibility is typically considered from economic, technical,
and organizational viewpoints.
-Economic feasibility involves question such as whether the firm can afford to build
the information system, whether its benefits should substantially exceed its
costs, and whether the project has higher priority than other projects that might
use the same resources.
-Technical feasibility involves question such
as whether the technology needed for the information system exists and whether
the firm has enough experience using that technology.
-Organizational
feasibility involves questions such
as whether the information system has enough support to be implemented
successfully, whether it brings as excessive amount of change, and whether the
organization is changing too rapidly to absorb it.
If the information system
appears to be feasible, the initiation phase produces a functional specification
and a project plan. The functional specification explains the important of the
business problem; summarizes changes in business processes; and estimates the
project’s benefits, costs, and risks. The project plan breaks the project into
sub-projects with start and completion times. It also identifies staffing,
resource requirements, and dependencies between project steps. The functional
specification is approved by both user and IS personnel. It clarifies the
purpose and scope of the proposed project by describing the business processes
that will be affected and how they will be performed using the system.
Functional specifications
once consisted primarily of prose. With the advent of diagramming tools such as
data flow have become much easier to read and understand. These visual
representations help parts of the system will play. Functional specifications
typically do not explain exactly what data, reports, or data entry screens will
be included. This more detailed description is produced in the development
phase.
2. Development
The development phase
creates computer programs (with accompanying user and programmer documentation)
plus installed hardware that accomplishes the data processing described in the functional
specification. This is done through a process of successive refinement in
which the functional requirements are translated into computer programs and
hardware requirements. The purpose of the various steps and deliverables in the
development phase is to ensure that the system accomplishes the goals explained
in the functional specification.
The first step in the
development phase is the detailed requirements analysis, which produces
a user-oriented description of exactly what the information system will do. This
step is usually performed by a team including user representative and the IS department.
It produces a document
called the external specification. Building on the functional specification,
the external specification shows the data input screens and major reports and
explains the calculations that will be automated. It shows what information
system users will see, rather than explaining exactly how the computer will
perform the required processing. Users reviewing this document focus on whether
they understand the data input screens, reports, and calculations, and whether
these will support the desired business process. By approving the external specification,
the users and IS staff signify their belief that the information system will accomplish
what they want.
The next step is internal
system design, in which the technical staff decides how the data processing
will be configured on the computer. This step produces the internal specification,
a technical blueprint for the information system. It documents the computer
environment the system will operate in, the detailed structure and content of
the database, and the inputs and outputs of all programs and subsystems. Users
do not sign off on the internal specification because it addresses technical
system design issues. Instead, the IS staff signs off that the internal
specification accomplishes the functions called for in the external
specification the users have approved.
Thus far the discussion
has focused on software. Because the software will work only if there is
hardware for it to run on, and essential step in the development phase is
hardware acquisition and installation. For some information systems, this is
not an issue because it is a foregone conclusion that existing hardware will be
used. Other systems require a careful analysis to decide which hardware to
acquire, how to acquire it most economically, where to put it, and how to
install it by the time it is indeed. Factors considered in hardware acquisition
decisions include compatibility with existing hardware and software, price,
customer service, and compatibility with long-term company plans. Computer
hardware can be purchased or rented through a variety of financing
arrangements, each with its own tax consequences. A firm’s finance department
usually makes the financing arrangements for significant hardware purchases.
Especially if new computer hardware requires a new computer room, lead times
for building the room, installing the electricity and air conditioning, and
installing the computer may be important factors in the project plan.
In firms with large IS
staffs; users rarely get involved with the acquisition, installation, and
operation of computer hardware. Much as with telephone systems, users expect the
hardware to be available when needed and complain furiously whenever it goes down.
This is one reason computer hardware managers sometimes consider their jobs
thankless.
Programming is the creation of the computer code that performs the calculations,
collects the data, and generates the reports. It can usually proceed while the hardware
is being acquired and installed. Programming includes the coding, testing, and
documentation of each program identified in the internal specification. Coding is
what most people think of as programming. The testing done during the
programming step is often called unit testing, because it treats the programs
in isolation. The documentation of each program starts with the explanation
from the internal specification and includes comments about technical
assumptions made in writing the program, plus any subtle, non-obvious
processing done by the program.
A number of improvements
in programming methods have made programming faster and more reliable. Structured
programming is often used to make the programs more consistent, easier to
understand and less error prone. Fourth Generation Languages (4GLs) also
expedite programming for some systems. However, as should be clear from all of
the steps leading up to coding and following coding, coding often accounts for
less than 20% of the work in developing a system. This is one of the reasons 4GLs
and other improved programming tools do not drastically shrink the system life cycle
for large systems, even when they slash programming time.
Documentation is another activity that can proceed in parallel with
programming and hardware acquisition. Both user and technical documentation is
completed from the material that already exists. The functional specification
and external specification are the basis for the user documentation, and
the internal specification and program documentation are the basis for the programmer
documentation. With the adoption of Computer Aided Software Engineering
(CASE) tools, more of the documentation is basically a compilation of data
and diagrams already stored on a computer. Additional user documentation is
usually required, however, because different users need to know different
things depending on their roles. People who perform data entry tasks need to
understand the data entry procedures and what the data mean; people who use
data from the system need to understand what the data mean and how to retrieve and
analyze data, but do not need to know much about data entry details.
After the individual
programs have been tested, the entire information system must be tested to
ensure that the programs operate together to accomplish the desired functions.
This is called the system testing, or integration testing. System tests frequently
uncover inconsistencies among programs as well as inconsistencies in the original
internal specification. These must be reconciled and the programs changed and
retested. One of the reasons for Microsoft’s “synch and stabilize”
method is to eliminate the surprises and extensive network that might occur if
system testing showed that programs were incompatible. Although system testing
may seem an obvious requirement, inadequate system testing has led to serious
problems. For example, a new trust accounting system put into operation prematurely
by Bank of America on March 1, 1987, lost data and fell months behind in
generating statements for customers. By January 1988, 100 institutional
customers with $ 4 billion in assets moved to other banks, several top
executives resigned, and 2.5 million lines of code were scrapped.
An important part of
testing is the creations of a testing plan, a precise statement of exactly how
the information system will be tested. This plan includes the data that will be
used for testing. Creating a testing plan serves many purposes. It encourages careful
thought about how the system will be tested. In addition, a thorough plan increases
the likelihood that all foreseeable contingences will be considered and that the
testing will catch more of the bugs in the system.
It should be clear that
the development phase for a large information system is a complex undertaking,
quite different from sitting down at a personal computer and developing a small
spreadsheet model. Explicitly separating out all the steps in the development
phase helps to ensure that the information system accomplishes the desired
functions and is debugged. Such an elaborate approach is needed because the system
is a tool of an organization rather than an individual. An individual producing
a spreadsheet is often typing to solve a current problem with no intention to
use the spreadsheet next month, much less that someone else will need to
decipher and modify it next year. In contrast, the traditional system life
cycle assumes that the information system may survive for years, may be used by
people who were not involved in its development, and may be changed repeatedly
during that time by people other than the original developers. The steps in the
traditional life cycle try to make the long-term existence of the information
system as efficient error-free as possible.
3. Implementation
Implementation is the process of putting a system into operation in an
organization. It starts with the end product of the development phase, namely,
a set of computer programs that run correctly on the computer, plus accompanying
documentation. This phase begins with implementation planning, the process of
creating plans for training, conversion, and acceptance testing.
The training plan explains
how and when the user will be trained. The conversion plan explains how and
when the organization will convert to new business processes. The
acceptance-testing plan describes the process and criteria for verifying that
the information system works properly in supporting the improved work system.
Training is the process of ensuring that system participants know what
they need to know about both the work system and the information system. The
training format depends on user backgrounds and the purpose and features of
both the work system and the information system. Users with no computer
experience may require special training. Training for frequently used
transaction processing systems differs from training for data analysis systems
that are used occasionally. Information systems performing diverse functions
require more extensive training than systems used repetitively for new
functions. Training manuals and presentations help in the implementation
system. After the previous methods have receded into history, other types of
training material are more appropriate.
Following the training
comes the carefully planned process of conversion from the old business
processes to new ones using the new information system. Conversion is often
called cutover or changeover. It can be accomplished in several ways, depending
on the nature of the work and the characteristics of the old and new systems.
One possibility is to simply choose a date, shut off the old information system,
and turn on the new one while hoping that the work system will operate as intended.
This is risky, though, because it does not verify that the information system will
operate properly and that the users understand how to use it.
Consider the following
example: The State of California installed an optical
disk system to streamline the process of doing title searches (establishing
ownership and identifying indebtedness on a property) for borrowers who wished
to purchase property. Previously, there was a 2 to 3 week delay between the
borrower’s loan request and the bank’s receipt of a confirmation that the title
was clear. The new system was to reduce this delay to 2 days. Both the vendor
and several state officials recommended that the existing manual system remain
in full operation during the conversion in case of problems. However, the
Secretary of Finance rejected the request for an additional $2.4 million, and
the manual system was simply shut down when the optical disk system came up.
Unfortunately, software bugs plagued the new system, and the resulting logjam
of 50,000 loan requests delayed title searches for up to 10 weeks. The new
system was shut down for repair, and the old manual system reinstated. The
Assistant Secretary of State said that some banks almost went out of business
because of the slow turnaround.
To minimize risk and
wasted effort, most conversions occur in stages, which can be done in several
ways. A phased approach uses the new information system and work system for a
limited subset of the processing while continuing to use old methods for the
rest of the processing. If something goes wrong, the part of the business using
the new system can switch back to the old system. The simultaneous use of the
old system and the new system is called running in parallel. Although
this involves double record keeping for a while, it verifies that the new
information system operates properly and helps the users understand how to use
it effectively within the new work system.
Conversions from one computerized system to another are often far more
difficult than users anticipate. Part of the problem is that computerized data
in the old system must be converted into the formats used by the new system. In
consistencies between the two systems frequently lead to confusion about
whether the data in either system are correct. Furthermore, programs that
convert the data from one system to another may have their own bugs, thereby
adding to confusion and delays.
Conversion requires
careful planning because people who don’t want the new system and use the problems
as an opportunity to complain can blow even minor problems out of proportion.
For these reasons, it is often wise to do a pilot implementation with a small
group of users who are enthusiastic about the system improvements. Ideally, their
enthusiasm will motivate them to make the effort to learn about the changes and
to forgive minor problems. After a pilot implementation demonstrates that the
new information system works, it is usually much easier to motivate everyone
else (including the skeptics) to start using it.
Acceptance testing is testing of the information system by the users as it goes
into operation. Acceptance testing is important because the information system
may not fit, regardless of what was approved and signed off in the external specification.
The business situation may have changed; the external specification may reflect
misunderstandings; the development process may have introduced errors; or the implementation
may have revealed unforeseen problems. For all these reasons, it makes sense to
include an explicit step of deciding whether the information system is accepted
for ongoing use. If it doesn’t fit user needs, for whatever reason, installing
it without changes may lead to major problems and may harm the organization
instead of helping. Acceptance testing also solidifies user commitment because
it gets people in the user organization to state publicly that the system
works.
The post-implementation
audit is the last step in the implementation phase,
even though it occurs after the new system has been in operation for a number
of months. Its purpose is to determine whether the project has met its
objectives for costs and benefits and to make recommendations for the
future. This is also an opportunity to identify what the organization can learn
from the way the project was carried out.
4. Operations and
Maintenance
The operation and
maintenance phase starts after the users have accepted the new system. This
phase can be divided into two activities: (1) ongoing operation and support,
and (2) maintenance. Unlike the other steps in the life cycle, these
steps continue throughout the system’s useful life. The end of a system’s life
cycle is its absorption into another system or its termination.
Ongoing operation and
support is the process of ensuring that the technical system components
continue to operate correctly and that the users use it effectively. This process
is similar to the process of making sure a car or building operates well. It works
best when a person or group has direct responsibility for keeping the information
system operating. This responsibility is often split, with the technical staff taking
care of computer operations and a member of the user organization ensuring that
users understand the system and use it effectively.
Day-to-day computer
operations typically include scheduled events such as generating summary reports
from management and backups of the database. The operations manual specifies
when these jobs should be done. For transaction processing systems essential to
the operation of the business, a member of the technical staff also monitors
computer-generated statistics related to response times, program run times,
disk space utilization, and similar factors to ensure the programs are running
efficiently.
When the database becomes
too full, or when response times start to increase, the technical configuration
of the information system must be changed. This is done by allocating more disk
space, unloading (backing up onto tape or discarding) data that are not current,
or changing job schedules.
Maintenance is the process of modifying the information system over time.
As users gain experience with a system, they discover its shortcomings and
usually suggest improvements. The shortcomings may involve problems unrelated
to the information system or may involve ways that the information system might
do more to support the work system, regardless of the original intentions. Some
shortcomings are bugs. Important shortcomings must be corrected if users are to
continue using an information system enthusiastically.
Handling enhancement
requests and bug fix requests is both a technical challenge and a delicate
political issue for IS departments. The technical challenge is ensuring that
changes don’t affect other parts of the system in unanticipated ways. The traditional
life cycle helps here because documentation and internal design methods enforce
modularization and make it easier to understand the scope and impact of changes.
The political issue for
most IS departments are their inability to support even half of the enhancement
requests they receive. For new or inadequately planned information systems,
some departments have more enhancement requests than they can even analyze. In
this environment, it requires both technical and political skill to keep users satisfied.
Users are often frustrated by how long it takes to make changes.
What might seem to be a
simple change to a person who “programs” spreadsheet is often vastly
more complex in a large information spawn changes in several levels of documentation.
The steps in each of the
four phases of the traditional system life cycle have now been introduced. Table
-1 outlines above the steps in each phase and makes two major points in
addition to the details it presents. First it shows that users are highly involved
in three of the four phases. In other words, building information systems is not
just technical work done by the technical staff. It also shows that each step
has specific deliverables that document progress to date and help keep the
project under control.
The traditional system
life cycle is a tightly controlled approach designed to reduce the likelihood
of mistakes or omissions? Despite its compelling logic, it has both advantages
and disadvantages. Adherence to fixed deliverables and signoffs improves
control but guarantees a lengthy process. Having specific deliverables due at
specific times makes it schedule of deliverables sometimes takes on a life of
its own and seems as important as the real project goals.
When merely going through
the motions of producing deliverables on schedule, participants may be tempted
to turn in work that is incomplete and to approve documents they do not truly
understand.
The traditional system
life cycle is the standard against which other approaches are compared. Project
managers who want to bypass some of its steps still need a way to deal with the
issues they raise.